A historic place of worship will reduce its carbon footprint following approval for solar panel installation.
Planning permission for the panels was awarded by Leeds City Council to the Grade II-listed St James Church situated on Low Lane in Horsforth.
According to a planning document, the initiative aligns with the Church of England’s objective to achieve carbon neutrality by 2030.
The application received no protests and was endorsed by local ward councillors.
A local resident who supported the plans stated that both Leeds City Council and the Church of England have set targets to lower their carbon footprints. The solar panels will not noticeably alter the building’s appearance. The plans would give the church improved heating and energy efficiency.
The document also outlined proposals for roof replacement at the church. Before the solar array is fitted, the existing roofing material will undergo extensive renovation, with roof insulation to be added where feasible to minimise heat loss during operation.
Constructed in the 1840s, the church has been protected by Historic England since 1962.
Overton Architects stated in a Heritage Statement that the church holds deep affection among those who currently and historically use it. To preserve this valued status, St James must remain viable in both practical and economic terms, which includes a responsibility to minimise its environmental impact.
